By implementing the recommendations, Element Critical was able to eliminate this CRAC unit and increase the leasable space within the room. To compensate the client had added a 97-ton CRAC unit in the adjacent suite to capture the room over temperature conditions and keep the environment within control. This technology would also be implemented in Element Criticals planned high density applications.Īt the point of CSIE’s involvement the room was over heating and the refrigerant door solution was not able to neutralize the load. CSIR recommended an improvement to the current refrigerated door solution, with an increased heat transfer and door capacity and additional redundancy. CSIE provided an engineering evaluation of this data center co-location facility to correct an existing cooling deficiency and future cooling requirements.